Our
specialist's analyse the site’s power supply to assess the capability and capacity of the
existing infrastructure. This includes details such as the kVA rating and
voltage of the supply transformer, the main isolator rating and settings, cable
sizes and number of cables per phase and the loading situation. We also analyse
at least one year’s worth of electricity usage to determine your maximum level
of historical demand.
(ROI) The estimated savings level/ROI that we will produce in your cost does not
include the additional benefits such as guaranteed longer equipment life,
reduced risk of failure, reduced capacity charges and increased security to your
equipment.
You are able to review many of our case studies before committing to buy. You
will see that saving levels vary even at the same optimisation level, this is
because different equipment will show different saving levels after
installation.
Click here to View our Case Studies